Thursday, June 13, 2019

Building Regulations Essay Example | Topics and Well Written Essays - 1500 words

Building Regulations - Essay ExampleGilbert Scott, that had been closed in 1982. The former power station offered all the space that was needed for the new museum. An world(prenominal) architectural competition was held which attracted entries from all over the world. However, Herzog and De Meuron a small Swiss firm won the honor of building the Tate Modern. The main reason they won was that their aim wanted to retain much of the essential character of the building. The power station consisted of a huge turbine hall, thirty-five metres high and 152 metres long, parallel to it is the boiler house. The turbine hall has call on a dramatic entrance argona with ramped access, plus exhibit for large sculptural projects. The boiler house became the galleries, and are on three levels running the across-the-board length of the building. The galleries are in separate but linked blocks called suites, and on either side of the escalators. The Tate collection of modern art is displayed on two of the movement floors, the third is devoted to temporary exhibitions. To the original roofline of the power station Herzog and De Meuron added a two-storey galls penthouse called a light beam. The top level of this houses a caf-restaurant with stunning views of the river and the City. The lower levels are members room with terraces on both sides of the building. The chimney is capped by a colored light, known as the swiss light, feature designed by the artist Michael Craig-Martin. The penthouse light beam and

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.